For years, load shedding in South Africa shaped how fleets planned their day. Drivers waited at fuel stations that couldn’t pump, trucks queued at warehouses with no power to load, and robots went dark at rush hour.
That has changed. According to Eskom, South Africa had recorded more than 540 consecutive days without load shedding by mid-November 2026, and the last round was in May 2025. Power cuts still happen, though. Load reduction affects some areas at peak times, and municipal faults, cable theft and substation failures can leave whole suburbs without electricity, often with no warning.
The supply risk is still there too. The latest Medium-Term System Adequacy Outlook, published in October 2026 by the National Transmission Company South Africa (NTCSA), expects about 8.75 GW of Eskom coal capacity to close in 2029 and 2030. It also warns that if new gas generation is delayed, the risk of supply shortfalls will rise in the 2030s. Fleets need to be able to keep working when the power goes off.
What is load shedding?
Load shedding is Eskom’s planned, rotational switching off of electricity to parts of the grid when demand exceeds supply. It runs in stages from Stage 1 to Stage 8. Each higher stage cuts more megawatts and leaves areas without power for longer.
Fleets also deal with two other kinds of outage:
- Load reduction: targeted cuts in specific high-demand areas, usually where networks are overloaded.
- Unplanned outages: faults, cable theft or substation failures on Eskom or municipal networks.
Load shedding follows a published schedule. Load reduction and unplanned outages often don’t, so they are harder to plan around.
How power cuts affect fleet operations
Refuelling
Fuel pumps need electricity. Many forecourts now have backup generators, but not all of them, and smaller or rural sites are the most likely to be caught out. A driver who pulls into a station without power on a low tank loses time and may have to change the route.
Traffic and travel times
When the robots are out, intersections slow to a crawl. Journey times become hard to predict, delivery windows are missed, and vehicles burn fuel while idling in traffic.
Loading, unloading and deliveries
During an outage, warehouses, distribution centres and customer sites may not be able to run forklifts, scanners, roller doors or payment systems. A vehicle can arrive on time and still sit waiting to be unloaded.
Cold chain and sensitive cargo
Refrigerated depots and customer storage facilities rely on power, so a delay at either end of the trip puts temperature-sensitive goods at risk.
Driver safety and security
Dark streets and vehicles standing at unlit intersections raise the risk of hijacking and theft, which is already a serious problem for South African fleets.
Electric vehicles
Fleets with EVs have an extra dependency, because depot charging schedules have to work around interruptions to supply.
Workshops and maintenance
Workshops need power for lifts, diagnostic equipment and compressors. A long outage can delay services and repairs, which keeps vehicles off the road for longer than planned.
Communications and back-office systems
During long outages, mobile network towers run on backup batteries, and coverage can drop once those run down. Dispatchers may lose contact with drivers just when routes need to change. Office systems such as booking, invoicing and customer service can also stop working if the depot has no backup power.

How to check the loadshedding schedule
When load shedding is in force, the loadshedding schedule is the first thing a fleet manager should check. You can find it on:
- Eskom’s load shedding portal for areas Eskom supplies directly.
- Your municipality’s website or app for areas supplied by the local council, such as City Power in Johannesburg or the City of Cape Town.
- Third-party apps that combine Eskom and municipal schedules and send alerts.
Each schedule divides the area into numbered blocks or zones, and each block has set time slots, usually two to four hours long depending on the municipality and the stage. Eskom can change the stage at short notice, so a schedule that was correct in the morning may be wrong by the afternoon. Assign someone to check for stage changes during the day and pass them on to dispatch.
Look up your depots, key routes and main delivery points as well as your head office. The schedule only covers load shedding, so you’ll need to monitor load reduction and unplanned outages separately.
How fleets can reduce disruption
1. Plan refuelling ahead
Set a minimum tank level, such as a quarter tank, at which drivers must refuel. Find stations with backup power on your key routes and add them to your approved refuelling list.
2. Track vehicles in real time
Vehicle tracking shows where every vehicle is, so you can see which ones are stuck in areas without power and let customers know about delays before they complain. It also improves security when vehicles are standing in unlit areas.
3. Optimise and adapt routes
Route optimisation lets you plan schedules around known outage times and reroute vehicles quickly when an unplanned cut hits. Shorter routes and less idling also bring fuel costs down.
4. Coordinate with customers and sites
Agree in advance what happens if a delivery point has no power. Can staff receive goods manually, or is there another time slot? Sorting this out beforehand saves drivers hours of waiting.
5. Keep drivers informed
Tell drivers what to do during an outage: where to refuel, how long to wait before moving on, and how to stay safe at intersections where the robots are out.
6. Prepare your depots
Backup power for gates, fuel tanks, cold storage and IT systems keeps your own site running during a cut. If you run EVs, schedule charging for periods when supply is reliable.
7. Learn from past disruptions
Fleet data shows where outages cost you most. Compare idle time, delivery delays and fuel use by area and time of day, and you’ll see which routes and customer sites need a backup plan. When a cut hits, you’ll have numbers to work from instead of guesses.
8. Cut idling during outages
Drivers often leave engines running while they wait for power to come back at a site or in traffic. Set a clear idling policy and track it, because those minutes add up across a fleet and raise fuel costs.
Preparing your fleet for power cuts
Load shedding in South Africa is on pause, but power cuts are still a risk for fleets. During the worst years, the operators that coped best could see where their vehicles were in real time and change plans quickly.
Find out how Webfleet’s vehicle tracking and route-planning tools can help your fleet stay on schedule when the power goes off.